Neste artigo que mereceu o destaque da revista electrónica internacional PM World Today do PM Forum, Alexandre Rodrigues analisa a tendência actual para o crescimento da adopção do método de Earned Value Management (EVM) para o controlo de projectos e programas, em todo o mundo e nas mais váriadas industrias e áreas de aplicação. São apresentados vários casos reais de implementação do método de EVM no mercado internacional.
Alexandre Rodrigues, International Correspondent - PM Forum, Maio 2008
The Earned Value Management (EVM) method has been introduced to the Project Management community for a number of decades. Initially developed in 1962 as a result of a joint effort between NASA and the US Department of Defense, the practical application of this project controlling technique was for a long period of time confined to specific industries and types of projects, particularly to the defense sector and to large projects. This phenomenon has mistakenly created the perception that EVM is only applicable (or worth applying), to these scenarios. Our practical experience over the last ten years of using and applying EVM in the field, has demonstrated exactly the contrary: Earned Value can be used effectively in any type of project and industry sector, very often requiring little effort in small projects. Ranging from small consulting projects with durations from 1 to 2 months and teams of 1 to 3 consultants, to large multi-year complex projects in the defense or telecommunications industries, we have been using Earned Value successfully. This is not only because Earned Value is, per se, a very complete and effective method for project performance measurement and controlling, but also because we developed a set of unique extensions to the basic method along with additional supporting tools and procedures. In this paper, we briefly present this extended version of Earned Value Management along with the critical factors for successful implementation, in particular communication and data quality issues.
Para leitura completa deste artigo, poderá consular a nossa secção de arquivo aqui >>
O logotipo PMI Registered Education Provider, o logotipo Project Management Institute (PMI), o logotipo certificação Project Management Professional (PMP), os acrónimos PMI®, PMP®, PMBOK® e OPM3® são marcas registadas do Project Management Institute, Inc. O logotipo AACE International Approved Education Provider, o logotipo AACE International (AACE), os acrónimos AACE® ,CCP, PSP, EVP, CEP, CFCC, DRMP, CCT, CST, TCM Framework são marcas registadas da Association of Advancement of Cost Engineering (AACE) International, Morgantown, WV, EUA. O logotipo College of Performance Management é uma marca registada do College of Performance Management, Inc. O logotipo APMG International, o logotipo Approved Training Provider (ATO), o acrónimo IPPM são marcas registadas do APM Group Limited. Todos os produtos e nomes de empresas são marcas registadas dos seus proprietários.
© 2024
Desenvolvido por Navega Bem - Portugal